A physician looks at a wet mount between patients, a nurse practitioner checks a urine sediment, a dentist reads a KOH prep. Under CLIA that is moderate complexity testing, and the certificate for provider-performed microscopy (PPM) is the narrow licence that covers it. This guide sets out who may hold it, the nine procedures, the fee and the duties, as 42 CFR 493, CMS and CDC stated them on 23 October 2026. PPM here is the lab certificate, not parts per million or a project management credential.

Frosted-glass render of a stained slide with a coverslip beside a stain dropper bottle
A1
A stained wet mount beside its dropper: read at the visit, by the provider, or it is not PPM.
  1. A1Wet mounts
  2. A2KOH preps
  3. A3Pinworm exams
  4. B1Fern tests
  5. B2Post-coital mucus exams
  6. B3Urine sediment
  7. C1Nasal smears
  8. C2Fecal leukocytes
  9. C3Semen: sperm and motility
The whole menu: nine microscopy procedures, plus any waived test, and nothing else (§ 493.19(c)).

Who may hold a PPM certificate

The certificate is built around the person at the microscope. A PPM procedure must be "personally performed", during the patient's visit, by one of three practitioners (§ 493.19(b)(1)):

  • A physician, on a specimen from their own patient or a patient of their group practice.
  • A midlevel practitioner, under a physician's supervision or in independent practice where the state allows it. CDC's PPM booklet names them: nurse midwife, nurse practitioner, physician assistant.
  • A dentist, on a specimen from their own patient or a patient of their group dental practice.

The microscope is "limited to bright-field or phase-contrast microscopy" (§ 493.19(b)(3)). The director must be a physician, a dentist or a midlevel practitioner licensed to practice independently in the state, with a state lab director licence where the state requires one (§ 493.1357), and may direct no more than five labs (§ 493.1359(a)). Each tester needs a state licence where required and one of the same three roles (§ 493.1363). How these roles sit beside the moderate and high complexity ones: CLIA personnel requirements.

21,736

labs hold a certificate for PPM procedures

CMS, September 2026

16,123

of them are physician office labs, about three in four

CMS, September 2026

Which procedures it covers

The regulation lists nine procedures. CMS keeps its own list of the billing codes that count as PPM, twelve codes in all (the same list sits in the Claims Processing Manual, Ch. 16 § 70.6). Read them side by side:

The nine PPM procedures in § 493.19(c) and the codes CMS lists for each
Well§ 493.19(c) wordingCMS code and wording (shortened)
A1All direct wet mount preparations for the presence or absence of bacteria, fungi, parasites, and human cellular elementsQ0111 Wet mounts, including preparations of vaginal, cervical or skin specimens
A2All potassium hydroxide (KOH) preparationsQ0112 All potassium hydroxide (KOH) preparations
A3Pinworm examinationsQ0113 Pinworm examinations
B1Fern testsQ0114 Fern test
B2Post-coital direct, qualitative examinations of vaginal or cervical mucousQ0115 Post-coital direct, qualitative examinations of vaginal or cervical mucous
B3Urine sediment examinations81015 Urinalysis; microscopic only81000 Urinalysis by dipstick or tablet reagent, non-automated, with microscopy81001 The same, automated, with microscopy: only with an automated dipstick instrument approved as waived81020 Urinalysis; two or three glass test
C1Nasal smears for granulocytes89190 Nasal smears for eosinophils
C2Fecal leukocyte examinations89055 Fecal leukocyte examination
C3Qualitative semen analysis (limited to the presence or absence of sperm and detection of motility)G0027 Semen analysis; presence and/or motility of sperm excluding Huhner
Caution

Granulocytes or eosinophils

The regulation says nasal smears "for granulocytes"; CMS's code list says "for eosinophils", one kind of granulocyte. Bill the code CMS lists, and if your smear is read for something the list does not name, ask your State Agency before you treat it as PPM.

Besides who performs it, each procedure must be moderate complexity, use the microscope as the primary instrument, involve a specimen that is labile or would suffer from delay, have no control material that monitors the whole process, and need little handling (§ 493.19(b)(2)–(6)). A new procedure joins the list only through a Federal Register notice (§ 493.19(d)).

Frosted-glass render of four differently stained slides side by side
B1
Four slides, four stains: each PPM procedure is its own test, checked on its own.

The fee and the application

CMS's fee schedule (updated 2024) lists $297 for a certificate for PPM procedures, paid every two years, with no survey fee. That is $49 more per cycle than a Certificate of Waiver at $248. A revised PPM certificate is $150 and a replacement $75.

The application is Form CMS-116 to your State Agency, with "PPM (Complete Sections I-VII and IX-X)" ticked; Section VII is where the PPM procedures go. CMS's apply page groups PPM with nonwaived testing: the director must meet CLIA's qualifications, and you send proof with the application. The certificate is valid "for a period of no more than 2 years" (§ 493.47(e)) and renews on an emailed invoice (CLIA certificate renewal). Once issued, it shows in CMS's lookup under the type "Microscopy - PPMP" (CLIA lookup).

CMS fee schedule, updated 2024, read 2026-10-23. Box by box: CMS-116 form: how to fill it out.

Takeaway

Compare the PPM fee with the alternatives in the CLIA fee calculator, or let the certificate finder confirm PPM is the right type.

What a PPM lab must keep doing

PPM is a nonwaived certificate in miniature. The lab is held to the certificate rules plus subparts H, J, K and M(§ 493.47(c)): proficiency testing, facility administration, the quality system and personnel.

A PPM lab's standing duties

  • Quality system rules for nonwaived testing (subparts J and K)§ 493.47(c)(2)
  • Verify each procedure's accuracy, no PT analyte appliestwice a year
  • Competency of each tester, first yearevery 6 months
  • Competency of each tester, after the first yearevery year
  • Notify a change of ownership, name, location or director30 days
  • Notify before any test outside the certificatebefore testing

Quality control

The procedures qualify for PPM partly because control material that covers the whole process does not exist. CDC's PPM booklet expects practitioners to "follow the manufacturers' directions for QC or follow good laboratory practices", to document all QC including errors and corrective action, and recommends two levels of controls, where available, each day of testing, with each new shipment of stains or reagents, each lot change and each new operator. Some of its advice goes beyond the rule, and it says so. A PPM lab may also use an IQCP (when IQCP replaces the default).

Accuracy checks instead of required PT

None of the nine procedures is a regulated PT analyte, so the lab must verify each one's accuracy "at least twice annually" (§ 493.1236(c)) and document it. CDC notes that several approved PT programs offer voluntary PPM modules that satisfy the check, and that a lab which enrols is bound by every PT rule, including the ban on referral. The check is explained in tests with no PT program; the programs are in the CMS-approved PT program list.

Competency

The director evaluates every tester (§ 493.1359(c)) with five procedures: direct observation, monitoring the recording and reporting of results, review of results or worksheets, blind or PT samples, and problem solving. CMS's competency brochure: "PPM competency assessments only need to include five of the six procedures", because instrument maintenance checks do not apply. The director may delegate single procedures in writing to another qualified PPM tester. Where the director is the only one testing, CMS asks for "a minimum proficiency level", documented, for example through PT samples or another entity reviewing the work. The full method is in CLIA competency assessment.

Note

Proposed, not in force

CMS's proposed rule of 8 October 2026 (CMS-3478-P) says: "We propose to rescind the regulations at Sec. 493.1359(c)(1) through (5) and (d)", the PPM director's competency duties. Comments are due December 7, 2026. Until a final rule says otherwise, keep assessing.

Will a PPM lab be surveyed?

Not routinely. A PPM lab is inspected only under the general inspection rules (§ 493.47(c)(3)). CMS's MLN fact sheet names the triggers: a complaint, testing beyond the certificate, a risk of harm from inaccurate testing, or "a need to collect PPM procedure information". CMS's survey manual adds that a PPM lab "may be included in an inspection sample of non-waived laboratories" (SOM § 6006.3). Keep the QC log, the accuracy checks and the competency files where a surveyor could see them on any working day.

When PPM is the wrong certificate

  • Someone else reads the slide. A medical assistant, nurse (other than a midlevel practitioner) or lab tech cannot perform PPM. The same exam is then plain moderate complexity testing, which needs a registration certificate and then compliance or accreditation.
  • The slide waits. PPM is done "during the patient's visit". Specimens batched for later fall outside it.
  • You add an analyzer. Any other moderate or high complexity test needs notice before the first patient result (§ 493.53(a)) and a new CMS-116 for compliance or accreditation.
  • You stopped the microscopy. A lab that runs only waived tests can move to a Certificate of Waiver on a new CMS-116; the CMS brochure lists the change from PPM to CoW.

An accredited lab that cuts back to PPM procedures alone may move down to a PPM certificate, and cannot keep its Certificate of Accreditation (SOM § 6014).

Takeaway

Only waived tests on the menu? The CLIA Certificate of Waiver costs less and asks less. Which tests are waived: CLIA-waived tests.